Landfill Techniques
Final capping Kronos Europe (Gent, Belgium)
Kronos Europe owns a landfill for the storage of the pressed residue, originating from the production of titanium dioxide. DEC was awarded the contract for the capping of the landfill, conform to the Vlarem II-legislation.
More about "Final capping Kronos Europe (Gent, Belgium)"Remediation of a medical waste dump (Steenokkerzeel, Belgium)
In Steenokkerzeel, an illegal medical waste dump was found that required remediation. The work started in April 2000 and lasted a bit longer than two years.
More about "Remediation of a medical waste dump (Steenokkerzeel, Belgium)"Capping of a goethite pond for Nyrstar (fka Umicore, Balen, Belgium)
At Nyrstar Balen, a goethite basin with a surface area of 200,000 m² was covered with bentonite mats and HDPE membrane.
More about "Capping of a goethite pond for Nyrstar (fka Umicore, Balen, Belgium)"Remediation Hooge Maey (Antwerp, Belgium)
DEC remediated two contaminated sites near the Hooge Maey disposal site for domestic waste in a project for the Intercommunal Hooge Maey.
More about "Remediation Hooge Maey (Antwerp, Belgium)"IMOG in Moen (Belgium)
For the construction of a new disposal site for household waste, DEC performed the planning work.
More about "IMOG in Moen (Belgium)"OVMB in Ghent (Belgium)
DEC performed various work for OVMB (Eastern Flemish Environmental Management) at their disposal site in Ghent.
More about "OVMB in Ghent (Belgium)"