Landfill Techniques
IMOG in Moen (Belgium)
Creation of a Category II disposal site: 28,000 m².
- Construction of an access road
- Augmentation, levelling and profiling work
- Construction of precipitate and percolate water drainage networks
- Construction of synthetic soil capping layer (HDPE membrane)
- Construction of leak detection system
Back
